In the app there are two different things that are easily mixed up:
- “Material usage” says: I used this. It documents the job and meets the requirement “Material recorded” for completion.
- “Request material” says: I am missing this, please get it. It triggers a request in the office and in the warehouse and can even block completion until the material is there or the usage has been recorded (see below).
You find both in the job as a tile in the documentation and in the expandable section “Material”, which contains both buttons. The buttons are locked for other people’s jobs and for completed jobs.
Report material usage
Section titled “Report material usage”How to do it
Section titled “How to do it”- In the job, tap the tile “Material usage”.
- If the job has planned material lines, they are listed under the heading “Planned”. Each line shows the item and the planned quantity. Set the quantity used with the plus and minus buttons. The button “As planned:
” takes over the planned quantity with one tap. - If something else was used, tap “Additional item”. Enter “Item/part”, “Quantity” and “Unit”.
- If needed, enter a “Note (optional)”.
- Tap “Save usage”.
If it works, you see “Material recorded ✓” and the window closes. Lines with a quantity of 0 are not sent. If all quantities are 0, nothing happens.
If nothing was used: “No material needed”
Section titled “If nothing was used: “No material needed””If no material was needed, tap “No material needed” in the same window. The app confirms “No material needed ✓”. This meets the requirement “Material recorded”.
Fields
Section titled “Fields”| Field | Meaning | Required |
|---|---|---|
| Quantity per planned line | How much was used (default 0) | no, but at least one quantity above 0 to save |
| Item/part (Additional item) | Name of the part | yes, for each extra line |
| Quantity (Additional item) | Quantity used | yes |
| Unit (Additional item) | For example pieces, metres | no, the server sets “Stk” if it is missing |
| Note (optional) | Applies to all lines of this report | no |
Up to 50 lines are possible per report, and the note may have up to 500 characters.
What happens next
Section titled “What happens next”Each line is saved on the server as a completed material item with its own number (status “Ready”, with a date). The office and the warehouse see the real usage in the job. The material status of the job is recalculated from all items.
Request material
Section titled “Request material”If a part is missing, request it.
How to do it
Section titled “How to do it”- Tap the tile “Request material” (or the same button in the “Material” section).
- Enter “Item/part”, “Quantity” and “Unit”.
- If needed, enter a “Reason”.
- Choose the “Urgency”: “High”, “Medium” (preselected) or “Low”.
- If needed, set the date under “Needed by”.
- Tap “Request”.
The app reports “Material requested ✓”. After that you can optionally add a photo to the request, for example of the broken part (see Photos).
Fields
Section titled “Fields”| Field | Meaning | Required |
|---|---|---|
| Item/part | What is needed | yes |
| Quantity | How much, greater than 0 | yes |
| Unit | For example pieces or metres | no, the server sets “Stk” if it is missing |
| Reason | Why the part is needed | no |
| Urgency | High, Medium or Low | Default: Medium |
| Needed by | Desired date | no |
What happens next
Section titled “What happens next”- The server creates a numbered material request (status “Requested”) and enters it in the job and in the history.
- In the office and in the warehouse, the people responsible see the request and process it. The status changes from “Ordered” and “Partly available” to “Ready”. If something is lacking, it says “Missing”.
- You see the status in the job in the “Material” section next to the latest request. On “Today”, the card “Open material request” shows the request as long as it is not “Ready”.
- If the material is reported as ready in the office, you receive the notification “Material ready” with the job number.
A request does not count as recorded usage. It is not automatically sent again if the outcome is unclear (otherwise it would be ordered twice). “Check” helps here too.
How material affects completion
Section titled “How material affects completion”The requirement “Material recorded” works like this:
- If there is no material request on the job, nothing is needed. The job can be completed without a material report.
- If there is at least one request, the job needs at least one recorded usage (an item with status “Ready”) or the confirmation “No material needed”. Otherwise the app reports “Can’t complete: material has not been recorded yet.”
So if you request material, you must either enter the usage or confirm “No material needed” before completing. In exceptional cases the office can resolve the completion via “Force completion” (Completion with a team).
Good to know
Section titled “Good to know”- The planned material lines come from the job that the office created. In the app you do not create an item from the article master data. Everything you enter is free text.
- If there is an error, both windows stay open and your entries stay in place. They only close when it works.
- Neither works without a network. It says “No connection to the server.” See Working without a network.
- Error texts: “Could not save.” (usage), “Request failed.” (request).
Frequently asked questions
Section titled “Frequently asked questions”Completion says “material has not been recorded yet”, although I did not use anything. In “Material usage”, tap “No material needed”.
I requested material and cannot complete the job. As long as neither a usage nor “No material needed” has been recorded after the request, the requirement stays open. Record the usage as soon as the material is there.
Can I withdraw a request? Not in the app. Write to the office via “Office”.